Waaree Energy Storage commences commercial production at 5.15 GWh battery pack manufacturing line in Gujarat​​


Waaree Energy Storage Solutions (Waaree ESS), a subsidiary of Waaree Energies Ltd, has commissioned its new battery pack manufacturing line, at Rola, Valsad, Gujarat. The line, with an annual installed capacity of 5.15 GWh, has commenced production.

This marks the second milestone in Waaree ESS’s 20 GWh energy storage manufacturing roadmap, following the opening of its 5.15 GWh battery energy storage system (BESS) container manufacturing facility at the same site in July 2026.

With battery packs and BESS containers now made at Rola, Waaree ESS is moving towards a fully integrated domestic storage value chain. The expansion is backed by INR 1,003 crore raised from strategic investors in January 2026. That raise is part of the Group’s INR 10,000 crore capital expenditure plan for 20 GWh of advanced lithium-ion cell and battery pack manufacturing.

“With battery packs and BESS containers now manufactured at Rola, and lithium cell manufacturing next on our roadmap, we are strengthening domestic capabilities to meet India’s growing demand for utility-scale and commercial and industrial energy storage,” said Sunil Rathi, director-Sales, Waaree Energies.

एक उत्तर छोड़ें

आपका ईमेल पता प्रकाशित नहीं किया जाएगा। आवश्यक फ़ील्ड को * से चिह्नित किया गया है