REAL ESTATE | Take a look inside The Apex


Designed to bring modern living and vibrant local businesses together.

Now leasing. Contact  262-204-7351 to schedule your private tour.

Slinger, Wis. – The skyline along Kettle Moraine Drive in Slinger is changing as the new Apex mixed-use development takes shape. Project developer Scott Ritger said the facility is designed to complement downtown while helping support local businesses and meet the community’s growing housing needs.

Apex

 

The development includes a four-story apartment building with commercial space on the ground floor and a separate townhome complex located behind the main structure.

 

When completed, the project will add dozens of new residents within walking distance of downtown shops, restaurants, and community amenities including the highly-soughtafter Slinger School District.

Ritger said the project would not have happened without the support and collaboration of Village officials and residents.

“The village, as far as the government and the RDA and the boards, have been just incredibly supportive of this project and really put their all into make sure it compliments their overall vision of what they want Downtown to look like in the next 2, 5, 10 years,” said Ritger. “That’s been huge.”

The main Apex building will feature 32 apartment units and two commercial spaces at street level. One commercial tenant, local barber Scotty, is relocating from a building that was on the site originally and is designing a brand new barber shop space in the new development. A second commercial space of approximately 1,400-square-feet remains available for lease.

Above the commercial level will be three stories of one and two-bedroom apartments ranging from roughly 700-square-feet to about 1,200 square feet. Behind the building, a separate townhome development will offer three-bedroom units measuring nearly 1,900-square-feet.

The townhomes are expected to be available by September 2026, while the main Apex building and commercial units are scheduled for completion in May 2027.

A vision years in the making

According to Ritger, the site has been discussed as a redevelopment opportunity for years.

The village previously explored concepts for the property but public reaction showed residents wanted something that better fit the character of downtown Slinger.

 

“The village had explored this site a few years ago and a larger corporate development team came in here with a vision,” Ritger said. “It was a much taller building, lots glass, had little input from neighbors and by the sounds of it was tabled pretty quick by the Village because the vision didn’t fit with other buildings in downtown and the public didn’t support it”.

After hearing community feedback, the concept was shelved.

Following the success of Ritger’s Seventh Hill apartment development, village leaders approached him about tackling another challenging site.

“Scott [Stortz] and some of the board members approached me and said, ‘Hey, you took an impossible site, literally the side of a hill, and it turned out beautiful,’” Ritger said. “We’ve rented up immediately after construction was complete. They said, ‘We’ve got a second challenge for you.’”

The village worked with Ritger to assemble parcels, provide input and design critiques and ultimately create a plan that would fit downtown’s character while remaining financially viable.

“They basically said, ‘Downtown is our next big focus, and doing it right is incredibly important, so we want to see this,’” Ritger said.

Balancing growth with downtown character

A key goal of the project was maintaining a historic feel rather than introducing a modern structure that would clash with neighboring buildings.

Village leaders emphasized incorporating architectural elements that reflected Slinger’s heritage.

Courtesy Slinger Historical Society

“We want to make sure it has a little bit of a historic feel to it and supports the restoration efforts of downtown RDA, and the museum and all of their visions all in one building,” Ritger said. “The juggling of opinions and input was a full time job but the end result is going to be worth it”

Leave a Reply

Your email address will not be published. Required fields are marked *